Thursday, September 11, 2008

Strike Freedom Construction - Day 8

Lots of progress on day 8 (it was actually on the labour day weekend). I worked on the model in two sessions on that day. The pic on the left shows what's done after the first session.

I included the shield in this pic, although there wasn't really much to work on, aside from taking it out of it's plastic bag :p It wasn't even attached to a runner, surprisingly.

On the beam saber, the 2 black stripes on the hilt are painted on.

And here on the right shows the final results of day 8. The entire hip cannon assembly is done :) Notice also that I now have the kit on the included stand. The stand is not sanded though, that would be too much work.

No comments: